No content found
This product doesn’t have any diagrams yet.
| Electrical | |
| Frequency | 380 – 2700 MHz |
|---|---|
| Max. Input Power | 300 W |
| Peak Input Power | 1.5 kW |
| Coupling |
3 dB6 dB10 dB15 dB20 dB30 dB
|
| Coupling Tolerance | ± 1.2 dB |
| Insertion Loss |
3.6 dB1.7 dB0.7 dB0.4 dB0.3 dB0.2 dB
|
| Impedance | 50 Ω |
| Application | Indoor / Outdoor |
| Isolation |
23 dB26 dB30 dB35 dB40 dB50 dB
|
| VSWR |
< 1.3:1< 1.25:1< 1.25:1< 1.25:1< 1.25:1< 1.25:1
|
| Passive Intermodulation | < -153 dBc (2 x 43 dBm) |
| Dissipative Loss |
0.2 dB0.15 dB0.1 dB0.1 dB0.1 dB0.1 dB
|
| Environmental | |
| Operating temperature range | -35 °C to +70 °C |
|---|---|
| Humidity | < 95% |
| Ingress Protection | IP65 |
| Mechanical | |
| Plating | Silver / Trimetal |
|---|---|
| Connection(s) | N(f) |
| Colour | Black |
| Historic Brand | Amphenol Procom |
| Weight | 0.66 kg / 1.46 lb |
| RoHS Compliant | Yes |
| Mounting | 4.5 mm dia. (two holes) |
This product doesn’t have any diagrams yet.
| Model | Product No. | Frequency | Add To Quote |
|---|---|---|---|
|
3 dB Coupling |
ADC-03-WBS-LP-NF-CC | 380 – 2700 MHz | |
|
6 dB Coupling |
ADC-06-WBS-LP-NF-CC | 380 – 2700 MHz | |
|
10 dB Coupling |
ADC-10-WBS-LP-NF-CC | 380 – 2700 MHz | |
|
15 dB Coupling |
ADC-15-WBS-LP-NF-CC | 380 – 2700 MHz | |
|
20 dB Coupling |
ADC-20-WBS-LP-NF-CC | 380 – 2700 MHz | |
|
30 dB Coupling |
ADC-30-WBS-LP-NF-CC | 380 – 2700 MHz |
You need to be logged in into your account to view downloadable documents.