APS-xx-WBS-LP-43F-CC

Power Splitter 400 W

Find Out More
CE Certification

Other Files

Quickly identify the correct ordering code.

APS-xx-WBS-LP-43F-CC
Electrical
Model
APS-02-WBS-LP-43F-CCAPS-03-WBS-LP-43F-CCAPS-04-WBS-LP-43F-CC
Frequency 380 – 2700 MHz
Max. Input Power 400 W
Peak Input Power 1.5 kW
Insertion Loss
0.22 dB0.3 dB0.4 dB
Impedance 50 Ω
Application Indoor / Outdoor
Split Loss
3 dB4.8 dB6 dB
VSWR
< 1.25:1< 1.25:1< 1.3:1
Passive Intermodulation < -153 dBc (2 x 43 dBm)
Environmental
Operating temperature range -35 °C to +70 °C
Humidity < 95%
Ingress Protection IP65
Mechanical
Conatct Material Trimetal
Connection(s) 4.3/10(f)
Colour Black
Historic Brand Amphenol Procom
Weight
Approx. 0.49 kg / 1.08 lb.Approx. 0.66 kg / 1.46 lb.Approx. 0.76 kg / 1.68 lb.
RoHS Compliant Yes
Mounting 3.2 mm / 1.13 in. dia. (four holes)
  • Amphenol Power Splitters covers the bands of 380 – 2700 MHz with a
  • PIM value of -153 dBc.
  • Average max power of 400 W.
  • Mechanically sound and robust which will allow these to be utilised indoors and outdoors with a IP 65 rating.
  • Connectors configurations of 4.3 – 10 Female.

No content found

This product doesn’t have any diagrams yet.

Model Product No. Frequency Add To Quote

2-Way Divider

APS-02-WBS-LP-43F-CC 380 – 2700 MHz

3-Way Divider

APS-03-WBS-LP-43F-CC 380 – 2700 MHz

4-Way Divider

APS-04-WBS-LP-43F-CC 380 – 2700 MHz

Login required

You need to be logged in into your account to view downloadable documents.

Mounting details

APS-02-WBS-LP-43F-CC

 

APS-03-WBS-LP-43F-CC

 

APS-04-WBS-LP-43F-CC

All dimensions are given in mm [in.]